Read the grid
ComEd publishes battery hosting capacity by circuit every quarter. We screen feeders and PJM value before we ever call a host.
No bill. No load study. No host capex. Gridalot leases a few parking spaces where the grid needs storage, drops in one standard battery on its own meter, and sells its capacity to the grid. The host earns rent and spends nothing.
We site where the utility says its wires can take a battery and where the market pays most for one. Then the grid keeps paying, for 10–20 years.
The whole model, from the empty corner to the grid payment. Illinois first, then California.
Big battery farms wait years in the transmission queue. Behind the meter, on distribution feeders, a battery skips that queue and answers the shortfall where the power is used.
The host's electricity bill is not an input to our model. Their parking spot is. That is why it scales.
ComEd publishes battery hosting capacity by circuit every quarter. We screen feeders and PJM value before we ever call a host.
A 10–15 year option on a few parking spaces. The host earns rent and spends nothing.
One standard 1–5 MWh design, its own meter, the same permit pack and contracts every time.
Rebate and tax credit up front; VPP, capacity and regulation revenue for 10–20 years.
ComEd publishes battery hosting capacity by circuit every quarter. We screen feeders and PJM value before we ever call a host.
A C&I battery usually begins with a year of interval data, a bespoke sizing and a one-off design. That is why soft costs eat about a quarter of a typical project. We designed them out.
We never need a year of interval data. The host’s bill is not an input.
SKIPPEDOne standard 1–5 MWh block, the same drawings every time.
SKIPPEDThe same permit pack and contracts on every site.
SKIPPEDBehind the meter, on distribution feeders.
SKIPPEDThe host earns rent and spends nothing.
SKIPPEDBudgeted at ~$15–19/kWh with the desk.
SKIPPEDIndicative, subject to diligence. Pre-tax cash; the rebate is taxable income, sheltered by 100% bonus depreciation. Credit sale price assumed at $0.90 per $1. Team model, Sep 2026.
Our first hire is already working: an AI development desk, trained for months on live projects. It does the reading, the maths and the first drafts. People decide and sign.
Benchmarks: Tim Hade (Brightfield AI) on the Catalyst podcast, Latitude Media, 30 Jul 2026. Gridalot figure = 18-month development budget, not yet a track record.
Base Power has raised over $2.5B since 2023 to own and dispatch home batteries, and was valued at $13B in Aug 2026. One Gridalot site holds as much as 100 of its home batteries: a gigawatt-hour is about 25,500 home installs, or about 255 of our sites.
Sources: TechCrunch and Electrek (3 Aug 2026), pv magazine (4 Aug 2026), Base Power’s Chicagoland launch (24 Jun 2026), Canary Media. Our comparison, from public information.
ComEd’s storage rebate under the state’s CRGA law, from 19 Oct 2026; batteries on their own meter qualify.
BC Hydro’s Energy Storage Incentive pays up to 80% of a business battery’s cost, for 10 years of dispatch.
State fast-charger grant open to 14 Jan 2027; emergency grid events pay $2/kWh through 2027.
Federal storage tax credit kept to 2033 by the July 2025 tax law, with an energy-community bonus.
Proposed for 10 years in the state storage programme (Aug 2026): homes first, businesses next.
Storage law signed Apr 2026; Dominion’s 450 MW VPP approved Aug 2026, payment rates due Nov 2026.
Sources: Illinois P.A. 104-0458 and ComEd rebate tariff (eff. 19 Oct 2026); BC Hydro ESI manual (Sep 2026); CEC Fast Charge California Project and CPUC ELRP; federal tax law of 4 Jul 2025; NJ BPU storage straw proposal (Aug 2026); Virginia HB 895 / SB 448 and SCC VPP order (Aug 2026).
The same leased corner, three jobs. The battery lets chargers open on today's connection, carries a depot's peak, and keeps critical loads running through a shutoff.
Chargers open on the existing connection instead of waiting for a service upgrade; the battery covers session peaks and the evening peak.
The battery carries the depot’s charging peak while the grid upgrade catches up.
Critical loads keep running when the utility cuts power; grid emergencies answered the rest of the year.
We assume no California storage rebate: SGIP’s large-scale storage budget closed to new applications at the end of 2025. Indicative, pre-tax, unlevered; 15 years, no escalation, charger hardware refreshed in year 10. Average corner (8 sessions a day): 9.3-year payback, 2% IRR. Without the state grant: 6.6 and 11.5 years. Chargers: average NEVI award cost per port (330 awards). Battery: Illinois team-model unit costs. PG&E BEV-2-S tariff, 1 Mar 2026. 32 kWh a session at $0.55/kWh; fuel credits about $0.05/kWh. The state grant is first come, first served, open to 14 Jan 2027.

Built and ran a 240 MWp develop-own-operate C&I business in Asia; leads development, structuring and capital.

AI-focused software engineer; built the agent platform our desk runs on. Ex-Rescale and ApplyBoard; co-founded two startups. Waterloo EE.
toby@gridalot.com
Seasoned transactional lawyer; Super Lawyers Rising Star 2021–26. Structured UP Green’s climate-fund deal: transaction, corporate structure, contracts.
cat@gridalot.comOwns the host relationships in the pipeline.
Design, utility filings and VPP enrolment.
Reading, maths and first drafts on every site; people decide and sign.
A small, seasoned transaction team used to deploying asset portfolios. Contract templates by our counsel: lease option ready; interconnection, supply, tax-credit sale and VPP agreements in preparation. Founder-led; operating partners are aligned through minority equity and an option pool.
30 Illinois sites already studied: feasibility done, lease options ready to sign.
Every tranche buys something that keeps its value: signed site options, utility applications and permitted projects that others can buy.
Then a committed construction-equity line ($39–49M) for sites that clear our return bar. Construction debt, the rebate and the tax credit carry the rest.
You get: platform equity, returns on every project, first right on the pipeline, a board seat and co-investment room for your LPs.